Prepare the paperwork for every stage of the job
A new quotation, an installation already under way and a site you have maintained for years all need clear records. Use the job and site information to prepare the relevant documents, while previous work stays available for reference.
-
Quotation and scope
Present the proposed supply, installation work, assumptions, exclusions, prices and terms. Keep the customer-facing document tied to the reviewed commercial version.
-
Technical specification
Carry the selected platform, equipment schedule, locations and recorded design settings into a useful technical reference.
-
Commissioning checklist
Prepare the checks that follow from the recorded design. The engineer performs and records the tests; actual readings and outcomes are completed on site.
-
Supplier purchase orders
Group saved equipment by supplier and use the buying prices and ordering identity. Review missing supplier information and exclude customer labour from the order.
-
Handover record
Bring together the installation particulars, documents, training, outstanding matters and sign-off. Design facts can be prepared in advance; declarations and completion remain human records.
-
Maintenance and service
Keep the covered assets, visit scope, findings, readings and remedial recommendations together. Prepare a printable service sheet from a saved quote or site record, with current visit findings and signatures left for the engineer to complete.
-
Invoice and commercial history
Prepare the invoice from the commercial record and retain the documents against the job and site. Previous work remains available when the next quotation starts.
Try ParoWorks with a job you already know
Bring your usual products and prices, then follow a familiar job through the workspace.